Beni-Jomson road connecting Mustang to the national highway via the northern part of Myagdi has been obstructed since this morning.
The landslide that occurred at Kavrebhir, the bordering Myagdi and Mustang, obstructed the vehicular movement along the 76-kilometer Beni-Jomson road section.
The supervisor of the Beni-Jomsom-Korala road project, Indra Singh Sherchan, said a big rock has fallen on the road on the road, causing vehicular movement obstruction.
He shared, "Preparation is underway to resume the traffic. They have proposed the District Administration Office through the road project to break the rock using explosive materials as the attempt to remove the rock by using a dozer went in vain."
According to the District Administration Office, a team of the Nepali Army with explosive materials has been sent to Kavrebhir for the same.
Vehicles plying towards Mustang from Beni and from Mustang to Myagdi have been stranded following the road obstruction.
READ ALSO: