Monday Nov 18, 2024
Monday Nov 18, 2024

Vehicular operation allowed on Anbukhaireni-Muglin section at night


Nepalnews
RSS
2022 Jun 13, 9:57, Tanahun
Representative Image

The vehicular operation has been permitted on the Abukhaireni-Muglin road section along the Prithvi Highway in Tanahun at night as well.

Vehicular movement was completely closed from 7.00 pm to 5.00 pm since last Friday after the road near the powerhouse at Anbukhaireni Rural Municipality-4 was washed away due to heavy rain.

Two-way traffic along the road section has been open since Sunday. The District Administration Office, Tanahun had banned the operation of vehicles during the stated time on Friday and Saturday considering the increased risk of travel at night.

Assistant Chief District Officer Kashiram Gaire shared that the operation of light and heavy vehicles was allowed since Sunday evening after the maintenance of the damaged road section.

The Road Division Office, Damauli had cut down a wall nearby the collapsed section of the road. Until complete road maintenance, the only one-way vehicular operation has been allowed along the damaged road section.

However, the vehicular movement would remain closed on Yampafant and Ghansikuwa road stretches from 11.00 pm to 4.00 am for the construction of the Muglin-Pokhara road section as per the previous notice.

READ ALSO:

Prithvi Highway Abukhaireni-Muglin road section Tanahun damaged road road maintenance
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

Kathmandu, Nepal,


Newsroom
##

E-mail
[email protected]

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal